ELSTER A1140 PDF

| | 0 Comments

Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.

Author: Dadal Tujin
Country: Kazakhstan
Language: English (Spanish)
Genre: Software
Published (Last): 3 January 2011
Pages: 280
PDF File Size: 6.80 Mb
ePub File Size: 5.9 Mb
ISBN: 541-6-39636-122-3
Downloads: 81108
Price: Free* [*Free Regsitration Required]
Uploader: Gukus

Retransmit is selected along with the appropriate Source, Pulse value and the Pulse width. Especially when the goods are often essential to your working elsyer. In the unlikely event that any of the eelster meter errors occur, a catastrophic failure has been detected and the meter should be returned to Elster Metering for failure investigation. You can even manage your booking online and re-arrange delivery for another date or arrange the goods to be left with a neighbour of your choice.

You may select a folder already on your system or select a new folder. All information required to program a meter is contained in the Help.

Probe with DTR disabled Probe with DTR enabled It is important to choose the correct probe for your installation, as optical communications will not be available if the wrong probe is selected. Using the F1 Key Warnings Elster Metering Systems would like to draw the user’s attention to the International Standard for Lithium Batteries – IEC – which gives further information about the handling, storage, transport and disposal of lithium cells.

Ct Ratio Programming A time and date stamp of the three most recent non-fatal error events is recorded where possible. The A permits up to 90 days of load profile data to be collected in less than 30 seconds. A way D type way D type way D type 5: RS Multi-drop Mode Switching Times There may be special days in the year when the tariff does not follow the normal pattern, e.

  INFOCUS IN2126 PDF

In elsteg cases delivery of your equipment may be subject to a minor delay. These can be taken care of by invoking Exclusion Dates. It should be simple enough to record my single phase consumption this part of the Emonpi worksrecord my generation, and derive import and export arithmetically.

Don’t show me this message again.

Elster A1140 MID CT Connected Polyphase Electronic meter with Pulse and Import/Export (UK504-041)

I would like to be able to automatically upload live data to pvoutput. After a short time the screen opposite is displayed. Alternatively the data can be exported in a file format that is suitable for being transferred into an MV90 system.

Power Master Unit Power Master Unit meter compatibility does a1140 allow different meter types to be programmed by the same scheme, therefore a separate manual support’s each application. Check that the terminal cover plate is in place before installing the module.

Up to 40 displays can be made available for each mode of operation. This facility is limited to reading data only. Check that there is no movement or loose parts within the meter enclosure. Select the appropriate meter variant only. Installation Check that there is no movement or loose parts within the meter enclosure. This manual supports A and A meters only. There is a wide variety of equipment meeting the required specifications available for use with Elster GSM modems.

Connection diagrams See Figure 5A for examples are shown underneath the terminal cover. Communications are provided via the optical IEC port and are supported by data stream mode, allowing fast reading of meter data.

  FRACTURAS DE SALTER Y HARRIS PDF

Season Changeover Dates A switching time for the 1 Jan is shown opposite. This Scheme may be used to program a number of different meters with the same Tariff and Display sequence.

Elster A1140 User Manual

Opening folders In the Scheme Manager, double click the leftmost mouse button on Schemes. Customers outside the UK: Rs Multi-drop Mode Select your preferred way to display the comments and click “Save settings” to activate your changes.

A Billing Reset on switching to Deferred Tariff can also be actioned. By pressing ‘print’ button you will print only current page.

A Three-phase CT Meter from MWA Technology

The meter has the facility to have elsster different switching program consisting of several switching times running ester different days of the week. Because we have a generator set I can’t locate the monitor behind the incoming electricity meter and use it to measure both import and export power, hence have to use our electricity suppliers meter to do that.

An option to perform an End of Billing on the Deferred Tariff Changeover Date is available as part of the deferred tariff structure. Repeat for kvarh using left hand Test LED. If you want to contact me direct you’re more than welcome to the details of my solution – I’ve sent you a private message with my email address.